Cut your bill with solar
Solar panel installation in the Philippines: we design, supply and install grid-tie, hybrid and off-grid solar for homes and businesses in Zambales and Pangasinan.
What we do
Panels on your roof, an inverter on your wall, a battery for brownouts. We supply, install and stay for after-sales.
One team from site visit to switch-on, for houses, shops, farms and resorts.
How installation worksYour bill, in panels
Type your monthly electric bill. We'll estimate the system that covers it.
₱5,000about ₱710 a monthYou save about ₱4,290 a month (86%).
That's a 4.41 kWp system: 7 panels of 630 W on about 20 m² of roof, making about 476 kWh a month.
Estimate only, before your utility's fixed monthly charges. Your rate is on your Meralco or electric co-op bill. We assume 4.5 sun hours a day, 80% system efficiency, and net metering that credits exported power at about half your rate (the utility's generation cost, which changes monthly). Your free quote follows a site visit and covers grid-tie, hybrid or off-grid options. How this is worked out.
From roof to switch-on
Site visit
We check your roof, wiring and last bills, in person.
Design and quote
A written quote: system size, equipment and full price.
Installation
Our installers mount, wire and test the whole system.
Switch-on
We set up your app and help with net metering papers.
Recent installations
- [Photo: upload to uploads/projects]
Rooftop installation - [Photo: upload to uploads/projects]
Hybrid inverter and battery - [Photo: upload to uploads/projects]
Business rooftop
Supply for homes and installers
630 W bifacial panels that also catch light reflected off the roof.
Questions people ask
CostHow much does a solar system cost?
It depends on how much electricity you use, your roof, and whether you want batteries. We visit, check your bill and roof, then give you a free written quote with the system size, the equipment and the full installed price. No obligation.
BrownoutsWill solar keep my lights on during a brownout?
Only if the system has a battery. A grid-tie system switches off when the grid goes down, for the safety of line workers. A hybrid system with a battery keeps your chosen circuits running, such as lights, fans, the ref and Wi-Fi.
Net meteringWhat is net metering?
Net metering lets you export the solar power you do not use to the grid. Your distribution utility, such as ZAMECO, DECORP, CENPELCO or PANELCO, credits each exported kWh at its blended generation cost and deducts the credit from your bill. It covers systems up to 100 kW under the Renewable Energy Act of 2008 (RA 9513), and we help with the application.
RoofIs my roof strong enough, and what about typhoons?
We check your roof during the site visit. Panels are fixed to the roof structure with rails and clamps for GI sheet, long-span or concrete roofs, and laid out to suit your roof and the local weather.
UpkeepHow much maintenance do solar panels need?
Very little. Rinse the panels when dust or leaves build up, especially in the dry season, and keep an eye on the inverter app. We are here for after-sales support if anything looks wrong.
InstallersDo you sell equipment to other installers?
Yes. We supply panels, inverters, batteries, mounting and protection to contractors and installers. Ask for our trade price list.
More answers, with the numbers worked out, in our solar guides.
Get your free quote
- Free site visit in Zambales and Pangasinan
- Written quote, no obligation
- We reply within one working day
[TODO: phone / Viber]